NIST Cybersecurity Framework 2.0
ID - Identify

NIST Cybersecurity Framework 2.0 NIST-CSF-ID.RA-07: Changes and exceptions are managed, assessed for risk impact, recorded, and tracked

Changes and exceptions are managed, assessed for risk impact, recorded, and tracked. Control from NIST Cybersecurity Framework 2.0 framework, domain: ID - Identify.

Maintained by Gerard BlokdykVerified against the published standard Control text last updated

What else in your programme already covers this

This control maps to 76 controls across 29 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

ISO 27701:2019 · 7 controls

  • 5.5.5 Documented information
  • 5.6.1 Operational planning and control
  • 5.6.2 Information security risk assessment
  • 6.11.2 Security in development and support processes
  • 6.9.1 Operational procedures and responsibilities
  • 7.2.5 Privacy impact assessment
  • 8.5.8 Change of subcontractor to process PII

PCI DSS 4.0 · 7 controls

  • 1.2.2 1.2.2 Network connection and NSC changes under change control
  • 10.2.1.5 10.2.1.5 Logs capture changes to identification and authentication credentials
  • 12.3.2 12.3.2 Targeted risk analysis for each customized-approach requirement
  • 12.5.3 12.5.3 Scope review after significant organisational change
  • 2.2.5 2.2.5 Insecure services, protocols or daemons secured
  • 6.5.1 6.5.1 Change control procedure for production
  • 6.5.2 6.5.2 Confirm PCI DSS controls after significant change

NIST SP 800-53 Rev 5 · 6 controls

FedRAMP High · 5 controls

  • CA-7(4) Continuous Monitoring | Risk Monitoring (CA-7(4))
  • CM-3 Configuration Change Control
  • CM-4 Impact Analyses
  • CM-4(2) Impact Analyses | Verification of Controls (CM-4(2))
  • CM-5 Access Restrictions for Change

FedRAMP Moderate · 5 controls

  • CA-7(4) Continuous Monitoring | Risk Monitoring (CA-7(4))
  • CM-3 Configuration Change Control
  • CM-4 Impact Analyses
  • CM-4(2) Impact Analyses | Verification of Controls (CM-4(2))
  • CM-5 Access Restrictions for Change

C5 (Germany) · 4 controls

  • C5-DEV-03 Policies for changes to information systems
  • C5-DEV-05 Risk assessment, categorisation and prioritisation of changes
  • C5-DEV-09 Approvals for provision in the production environment
  • C5-SP-03 Exceptions from Existing Policies and Instructions
  • CPS220-P33 Risks Arising from Strategic Objectives and the Business Plan
  • CPS220-P48 Assessment Following Material Change Outside the Review Cycle
  • CPS220-P54 APRA Notification of Material Changes to the Institution

CMMC 2.0 · 3 controls

NIST SP 800-171 Rev 3 · 3 controls

  • SEC01-BP06 Automate deployment of standard security controls
  • SEC11-BP06 Deploy software programmatically
  • ISM-0912 Change and configuration management plan
  • ISM-1211 Administration under change and configuration management
  • AM-2 Use only approved services
  • ASBv3-PV-4 Audit and enforce secure configurations for compute resources

CIS Controls v8 · 2 controls

  • CIS-2.2 Ensure Authorized Software is Currently Supported
  • CIS-2.3 Address Unauthorized Software

ISO 27002:2022 · 2 controls

  • 5.22 Monitoring, review and change management of supplier services
  • 8.32 Change management

ISO/IEC 42001:2023 · 2 controls

  • 6.3 Planning of changes
  • 8.2 AI risk assessment

NIS2 Directive · 2 controls

  • Art.21.2.e Security in acquisition, development and maintenance, including vulnerability handling and disclosure
  • Art.21.4 Take corrective measures without undue delay on finding that the measures are not met

NIST SP 800-161 Rev 1 · 2 controls

SOC 2 · 2 controls

  • SOC2-CC3.4 CC3.4 Identifying and assessing significant changes (COSO principle 9)
  • SOC2-CC8.1 CC8.1 Managing changes to procedures, software, data and infrastructure
  • CPS230-P26 Assessment of Business and Strategic Decisions on the Risk Profile

APRA CPS 234 · 1 control

  • CPS234-P17 Active Maintenance of Capability Against Change
  • SPS220-P31 Assessment Following Material Developments Outside the Review Cycle
  • ADMF-5.5 Manage and accept residual risk
  • CFTC-SS-32 Timely Advance Notice of Material Planned Changes

ISO 22301:2019 · 1 control

  • 6.3 Planning changes to the business continuity management system

ISO 27001:2022 · 1 control

  • 8.32 Change management
  • PR.IP-3 PR.IP-3: Configuration change control processes are in place
  • PR.IP-3 PR.IP-3: Configuration change control processes are in place

NIST SP 800-218 · 1 control

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.

Other controls in ID - Identify

You are reading one control. How much of NIST Cybersecurity Framework 2.0 have you already done?

NIST Cybersecurity Framework 2.0 NIST-CSF-ID.RA-07 is one control. If you already hold one of the frameworks below, a reviewed crosswalk already says how much of NIST Cybersecurity Framework 2.0 your existing evidence covers. Hold ISO 27001:2022 and 73 of 106 NIST Cybersecurity Framework 2.0 controls already carry evidence.

Each report names every control your existing framework evidences, every one it does not, the reasoning behind each claim, and the claims that were argued against and rejected. 174 were rejected on the ISO 27001:2022 pair alone.

Query this from an agent

The graph holds this control, the 76 it maps to, and the evidence behind each claim, over MCP and REST.