C5 (Germany)
C5: Procurement, Development and Modification of Information Systems

C5 (Germany) C5-DEV-09: Approvals for provision in the production environment

Require authorised personnel or approval components to release each change into the production environment against defined criteria such as test results and prior sign-offs, involving cloud customers in that release where contractual requirements provide for it.

Maintained by Gerard BlokdykVerified against the published standard Control text last updated

What else in your programme already covers this

This control maps to 31 controls across 17 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

NIST SP 800-218 · 3 controls

CMMC 2.0 · 2 controls

FedRAMP High · 2 controls

  • CM-3 Configuration Change Control
  • CM-5 Access Restrictions for Change

FedRAMP Moderate · 2 controls

  • CM-3 Configuration Change Control
  • CM-5 Access Restrictions for Change

ISO 27001:2022 · 2 controls

  • 8.19 Installation of software on operational systems
  • 8.32 Change management

ISO 27002:2022 · 2 controls

  • 8.19 Installation of software on operational systems
  • 8.32 Change management

NIST SP 800-161 Rev 1 · 2 controls

NIST SP 800-171 Rev 3 · 2 controls

NIST SP 800-53 Rev 5 · 2 controls

  • DS-6 Enforce security of workload throughout DevOps lifecycle

ISO 27701:2019 · 1 control

  • 6.9.5 Control of operational software

NIS2 Directive · 1 control

  • Art.21.2.e Security in acquisition, development and maintenance, including vulnerability handling and disclosure
  • NIST-CSF-ID.RA-07 Changes and exceptions are managed, assessed for risk impact, recorded, and tracked

PCI DSS 4.0 · 1 control

  • 6.5.1 6.5.1 Change control procedure for production

SOC 2 · 1 control

  • SOC2-CC8.1 CC8.1 Managing changes to procedures, software, data and infrastructure

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.

Other controls in C5: Procurement, Development and Modification of Information Systems

You are reading one control. How much of C5 (Germany) have you already done?

C5 (Germany) C5-DEV-09 is one control. If you already hold one of the frameworks below, a reviewed crosswalk already says how much of C5 (Germany) your existing evidence covers. Hold Cloud Security Alliance Cloud Controls Matrix (CCM) v4.0.1 and 95 of 121 C5 (Germany) controls already carry evidence.

Each report names every control your existing framework evidences, every one it does not, the reasoning behind each claim, and the claims that were argued against and rejected. 0 were rejected on the Cloud Security Alliance Cloud Controls Matrix (CCM) v4.0.1 pair alone.

Query this from an agent

The graph holds this control, the 31 it maps to, and the evidence behind each claim, over MCP and REST.