FedRAMP Moderate
CM - Configuration Management

FedRAMP Moderate CM-4: Impact Analyses

Analyze changes to determine potential security/privacy impacts.

Maintained by Gerard BlokdykVerified against the published standard Control text last updated

What else in your programme already covers this

This control maps to 24 controls across 17 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

PCI DSS 4.0 · 5 controls

  • 1.2.2 Changes to NSC reviewed and approved
  • 11.3.1.3 Internal scans after significant changes
  • 12.5.3 Impact analysis on org structure changes (SP)
  • 6.5.1 Changes to all system components in the production environment are made according to established procedures that include: • Reason for, and description of, the change. • Documentation of security impact. • Documented change approval
  • 6.5.2 Upon completion of a significant change, all applicable PCI DSS requirements are confirmed to be in place on all new or changed systems and networks, and documentation is updated as applicable
  • SEC01-BP07 Identify threats and prioritize mitigations using a threat model
  • SEC11-BP04 Conduct code reviews
  • CFTC-SS-12 Capacity and Performance Planning Category
  • CFTC-SS-32 Timely Advance Notice of Material Planned Changes

SOC 2 · 2 controls

  • SOC2-CC3.4 COSO principle 9: Identifies and assesses changes that could impact internal controls
  • SOC2-CC8.1 Change management processes are in place
  • CPS220-P48 Assessment Following Material Change Outside the Review Cycle
  • CPS230-P26 Assessment of Business and Strategic Decisions on the Risk Profile

APRA CPS 234 · 1 control

  • CPS234-P31 Annual Review of Testing Program Sufficiency

C5 (Germany) · 1 control

  • C5-DEV-05 Risk assessment, categorisation and prioritisation of changes

CMMC 2.0 · 1 control

ISO 27001:2022 · 1 control

  • 8.32 Change management

ISO 27002:2022 · 1 control

  • 8.32 Change management
  • NIST-CSF-ID.RA-07 Changes and exceptions are managed, assessed for risk impact, recorded, and tracked

NIST SP 800-218 · 1 control

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.

Other controls in CM - Configuration Management

You are reading one control. How much of FedRAMP Moderate have you already done?

FedRAMP Moderate CM-4 is one control. If you already hold one of the frameworks below, a reviewed crosswalk already says how much of FedRAMP Moderate your existing evidence covers. Hold ISO 27002:2022 and 182 of 323 FedRAMP Moderate controls already carry evidence.

Each report names every control your existing framework evidences, every one it does not, the reasoning behind each claim, and the claims that were argued against and rejected. 348 were rejected on the ISO 27002:2022 pair alone.

Query this from an agent

The graph holds this control, the 24 it maps to, and the evidence behind each claim, over MCP and REST.