NFPA 111-2025 Standard on Stored Electrical Energy Emergency and Standby Power Systems 8.4.5-8.4.6: 8.4.5 and 8.4.6 Written records and qualified personnel

A written record of every 8.4.2 check and test is kept and available to the AHJ, and the maintenance and testing programme is carried out by qualified personnel.

Maintained by Gerard Blokdyk

What else in your programme already covers this

This control maps to 2 controls across 2 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

  • 8.4.8 8.4.8 Oversight by a properly instructed person
  • 17.106-17.108 UPS single-line diagram, site logbook and records of alarms, outages, tests and servicing

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.