NFPA 111-2025 Standard on Stored Electrical Energy Emergency and Standby Power Systems
Chapter 8: Routine maintenance and operational testing – NFPA 111-2025 Standard on Stored Electrical Energy Emergency and Standby Power Systems

NFPA 111-2025 Standard on Stored Electrical Energy Emergency and Standby Power Systems 8.3.3: 8.3.3 Reproducible records

A reproducible record of inspections, tests and repairs is kept on the premises, showing a completed log, any unsatisfactory condition with the corrective action and parts replaced, who did the servicing, and proof of a completed SEPSS test under 8.4.1 straight after any repair or battery replacement.

Maintained by Gerard Blokdyk

What else in your programme already covers this

This control maps to 2 controls across 2 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

  • 17.106-17.108 UPS single-line diagram, site logbook and records of alarms, outages, tests and servicing

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.

Other controls in Chapter 8: Routine maintenance and operational testing – NFPA 111-2025 Standard on Stored Electrical Energy Emergency and Standby Power Systems

Query this from an agent

The graph holds this control, the 2 it maps to, and the evidence behind each claim, over MCP and REST.