A reproducible record of inspections, tests and repairs is kept on the premises, showing a completed log, any unsatisfactory condition with the corrective action and parts replaced, who did the servicing, and proof of a completed SEPSS test under 8.4.1 straight after any repair or battery replacement.
This control maps to 2 controls across 2 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.
Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.
The graph holds this control, the 2 it maps to, and the evidence behind each claim, over MCP and REST.