ISO 55001:2024
Operation – ISO 55001:2024

ISO 55001:2024 8.2: Control of change

What does 8.2 require?

The organization keeps planned changes under control and looks at the effects of changes that were not intended, acting where necessary to limit any harm.

Maintained by Gerard Blokdyk

What else in your programme already covers this

This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

ISO 55001:2014 · 1 control

  • 8.2 Management of change

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.

Other controls in Operation – ISO 55001:2024

You are reading one control. How much of ISO 55001:2024 have you already done?

ISO 55001:2024 8.2 is one control. If you already hold one of the frameworks below, a reviewed crosswalk already says how much of ISO 55001:2024 your existing evidence covers. Hold ISO 55001:2014 and 27 of 38 ISO 55001:2024 controls already carry evidence.

Each report names every control your existing framework evidences, every one it does not, the reasoning behind each claim, and the claims that were argued against and rejected. 0 were rejected on the ISO 55001:2014 pair alone.

Query this from an agent

The graph holds this control, the 1 it maps to, and the evidence behind each claim, over MCP and REST.