EU ATEX Directive (Directive 2014/34/EU)
Chapter 3 and Annexes III to X: Conformity assessment, EU declaration of conformity and marking – EU ATEX Directive (Directive 2014/34/EU)

EU ATEX Directive (Directive 2014/34/EU) 13.1c-d: Category 3 by internal production control, with unit verification available for any group

What does 13.1c-d require?

Category 3 equipment of group II follows internal production control (Module A). For groups I and II, unit verification by a notified body (Module G) may be used as an alternative to any of the other routes. For the other-hazard safety aspects of Annex II point 1.2.7, the Module A procedure may also be followed in addition to the main route.

Maintained by Gerard Blokdyk

Other controls in Chapter 3 and Annexes III to X: Conformity assessment, EU declaration of conformity and marking – EU ATEX Directive (Directive 2014/34/EU)

Query this from an agent

The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.