Category 3 equipment of group II follows internal production control (Module A). For groups I and II, unit verification by a notified body (Module G) may be used as an alternative to any of the other routes. For the other-hazard safety aspects of Annex II point 1.2.7, the Module A procedure may also be followed in addition to the main route.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.