Australia National Construction Code 2022 Volume Two (Building Code of Australia, Class 1 and 10 Buildings)
Schedules 4 to 11: State and Territory variations and additions – Australia National Construction Code 2022 Volume Two (Building Code of Australia, Class 1 and 10 Buildings)

Australia National Construction Code 2022 Volume Two (Building Code of Australia, Class 1 and 10 Buildings) WA-H1D7: Western Australia: WA H1D7 cyclonic testing of metal roofs in wind region B

Western Australia replaces H1D7 so that the low-high-low cyclic pressure test sequence of Table H1D7 (4500, 600, 80, 1, 80, 600 and 4500 cycles at 0.45, 0.6, 0.8, 1.0, 0.8, 0.6 and 0.45 of the ultimate limit state pressure) applies to metal roof assemblies, their connections and immediate supports in wind regions B, C and D, not only C and D; the other cladding routes are as in the national clause. WA also treats wind region B (including B2) as a cyclonic classification and keeps region D design wind speeds north of the Tropic of Capricorn similar to the 2011 edition of AS/NZS 1170.2, through its Schedule 1, Schedule 2 and Housing Provisions variations.

Maintained by Gerard Blokdyk

Other controls in Schedules 4 to 11: State and Territory variations and additions – Australia National Construction Code 2022 Volume Two (Building Code of Australia, Class 1 and 10 Buildings)

Query this from an agent

The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.