For plant required to be registered, the person with management or control keeps records of all tests, inspections, maintenance, commissioning, decommissioning, dismantling and alterations for as long as the plant is used or until it relinquishes control, keeps them available for inspection and passes them to anyone who takes control.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.