A PCBU that commissions plant does not commission an item specified in Part 2 of Schedule 5 for workplace use unless the item is registered under Part 5.3, though adjustments, tests and inspections needed during commissioning may be done beforehand.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.