As design is refined, opportunities remain to eliminate or minimise risks. Designers should review solutions at various points to confirm that risk controls are effective and, if necessary, redesign. Design safety reviews should involve the people who will build the structure where possible, and otherwise people with construction and maintenance experience. Health and safety aspects of the design should be reflected in the requirements of construction contract documents and help select suitable, competent contractors.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.