Australia Model Code of Practice: Safe Design of Structures
Section 3: Integrating design and risk management – Australia Model Code of Practice: Safe Design of Structures

Australia Model Code of Practice: Safe Design of Structures 3.1a: 3.1 In pre-design, set the design and risk context, skills and roles

The pre-design phase establishes the design context (purpose, scope and complexity of the project), the risk management context (the breadth of physical and psychosocial hazards and the legislation, codes and standards to be considered), the design disciplines, skills and competencies needed, the roles and responsibilities of the parties and collaborative relationships with clients and others who influence the design, and carries out consultation and research to help identify hazards and assess and control risks.

Maintained by Gerard Blokdyk

Other controls in Section 3: Integrating design and risk management – Australia Model Code of Practice: Safe Design of Structures

Query this from an agent

The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.