Australia Model Code of Practice: Safe Design of Structures
Section 3: Integrating design and risk management – Australia Model Code of Practice: Safe Design of Structures

Australia Model Code of Practice: Safe Design of Structures 3.3a: 3.3 In design development, work through options by the hierarchy, test and finalise with a safety report

In design development concepts become detailed drawings and specifications, control measures are decided and construction documentation prepared. The phase should involve developing design options in line with the hierarchy of control, selecting the optimum solution while balancing direct and indirect costs against benefits, testing, trialling or evaluating the solution, redesigning to control residual risks, and finalising the design with the safety report and the risk control information needed for the lifecycle. Control measures for common hazards may be chosen from known solutions, and novel or complex hazards may need a risk assessment.

Maintained by Gerard Blokdyk

Other controls in Section 3: Integrating design and risk management – Australia Model Code of Practice: Safe Design of Structures

Query this from an agent

The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.