Australia Model Code of Practice: Excavation Work 3.6h: 3.6 Make services information available and keep it (WHS Regulation 304)

Underground essential services information that has been obtained must be made available to every worker, the principal contractor and subcontractors; be readily available for inspection as the WHS Act requires; and be kept until the excavation work is finished, or, where a notifiable incident relates to the excavation work, for two years after that incident.