Where major excavation is under way before building starts, the commissioning person may appoint the excavation contractor as principal contractor for the site preparation stage and later replace it with a building contractor once that stage ends. While so appointed, the excavation contractor must carry out all the principal contractor duties.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.