Australia Model Code of Practice: Excavation Work
Section 3: Planning the excavation work – Australia Model Code of Practice: Excavation Work

Australia Model Code of Practice: Excavation Work 3.1a: 3.1 Principal contractor duties on a construction project (WHS Regulations 292, 293)

A construction project is one involving construction work costing $250 000 or more, and it has only one principal contractor: either the person commissioning the work or a person they appoint to the role. Among the principal contractor's duties are: drawing up a WHS management plan and keeping it under review; before any high risk construction work starts, preparing a SWMS or making all reasonable efforts to get one another person has prepared; arranging management of the work environment, including falls, first aid, facilities, traffic management and an emergency plan; putting up signs showing who the principal contractor is, how to contact it and where the site office is; and securing the construction workplace. The construction work code explains how construction cost is worked out.

Maintained by Gerard Blokdyk

Other controls in Section 3: Planning the excavation work – Australia Model Code of Practice: Excavation Work

Query this from an agent

The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.