Arizona Air Quality Regulations (ADEQ / ARS Title 49 / AAC Title 18 Chapter 2)
A.A.C. R18-2 Article 3: monitoring, testing, reporting and records – Arizona Air Quality Regulations (ADEQ / ARS Title 49 / AAC Title 18 Chapter 2)

Arizona Air Quality Regulations (ADEQ / ARS Title 49 / AAC Title 18 Chapter 2) R18-2-315: R18-2-315: post the permit and mark equipment

A holder of an individual or general permit must post the permit or a certificate of issuance where the equipment is installed, clearly visible and accessible, mark all covered equipment with the permit number or a serial or equipment number listed in the permit, and keep a complete copy of the permit on site.

Maintained by Gerard Blokdyk

Other controls in A.A.C. R18-2 Article 3: monitoring, testing, reporting and records – Arizona Air Quality Regulations (ADEQ / ARS Title 49 / AAC Title 18 Chapter 2)

Query this from an agent

The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.