Cross-Framework Mapping

AS9100D — Aerospace Quality Management SystemvsUK FCA/PRA Operational Resilience Framework

See exactly how AS9100D — Aerospace Quality Management System controls map to UK FCA/PRA Operational Resilience Framework. Pre-computed mappings, identified gaps, and coverage analysis.

8
Controls Mapped
49
Gaps Found
14%
Coverage

According to the TheArtOfService Compliance Knowledge Graph:

AS9100D — Aerospace Quality Management System maps to UK FCA/PRA Operational Resilience Framework with 14% coverage across 8 directly mapped controls. Analysis of 57 AS9100D — Aerospace Quality Management System controls identifies 49 compliance gaps — primarily concentrated in Operation (Clause 8).

Source: TheArtOfService Knowledge Graph | 57 controls analysed | 693 frameworks | 819K+ cross-framework mappings

Control Mappings

Showing 8 of 8 mapped controls across 4 domains. Sign up to explore all 819K+ mappings across 693 frameworks.

Improvement (Clause 10)(3 mappings)

AS9100D-10.2Nonconformity and Corrective Action
SYSC 15A.6.1Continuous Improvement
ISO27003-10.1Continual Improvement
SYSC 15A.6.1Continuous Improvement
ISO27003-10.2Nonconformity and Corrective Action
SYSC 15A.6.1Continuous Improvement

Operation (Clause 8)(3 mappings)

AS9100D-8.4Control of Externally Provided Processes, Products, and Services
SYSC 15A.6.4Outsourcing and Third-Party Risk
ISO27003-8.1Operational Planning and Control
SYSC 15A.6.4Outsourcing and Third-Party Risk
ISO27003-8.2Information Security Risk Assessment
SYSC 15A.3.3Consumer and Market Impact Assessment

Context of the Organization (Clause 4)(1 mappings)

ISO27003-4.2Understanding Needs and Expectations of Interested Parties
SYSC 15A.6.4Outsourcing and Third-Party Risk

Planning (Clause 6)(1 mappings)

ISO27003-6.1Actions to Address Risks and Opportunities
SYSC 15A.3.3Consumer and Market Impact Assessment

Related Comparisons

Other AS9100D — Aerospace Quality Management System comparisons

Other UK FCA/PRA Operational Resilience Framework comparisons

Stop Paying Consultants to Read Spreadsheets

AI-powered compliance intelligence across 693 frameworks — at a fraction of consulting costs.

$0/forever

Free

  • 693 framework browser
  • Cross-framework mappings (819K+)
  • 824 compliance assessments
  • 3 AI queries & searches per day
Get Started Free
Recommended
$49/month

Professional

  • Unlimited AI Compliance Advisory
  • Unlimited full-text search
  • Framework self-assessment
  • PDF, Excel & CSV exports
Start 7-Day Free Trial →

What are the key differences between AS9100D — Aerospace Quality Management System and UK FCA/PRA Operational Resilience Framework?

AS9100D — Aerospace Quality Management System has 57 controls across its framework, while UK FCA/PRA Operational Resilience Framework covers 20 controls. Direct mapping analysis identifies 8 overlapping controls (14% coverage). The frameworks diverge most significantly in Operation (Clause 8), where 11 AS9100D — Aerospace Quality Management System controls have no direct UK FCA/PRA Operational Resilience Framework equivalent.

How many controls map between AS9100D — Aerospace Quality Management System and UK FCA/PRA Operational Resilience Framework?

Of 57 total AS9100D — Aerospace Quality Management System controls, 8 map directly to UK FCA/PRA Operational Resilience Framework controls — representing 14% coverage. The remaining 49 controls represent compliance gaps requiring additional documentation or compensating controls to satisfy both frameworks simultaneously.

What are the compliance gaps when mapping AS9100D — Aerospace Quality Management System to UK FCA/PRA Operational Resilience Framework?

49 AS9100D — Aerospace Quality Management System controls have no direct equivalent in UK FCA/PRA Operational Resilience Framework. The highest concentration of gaps is in Operation (Clause 8) with 11 unmapped controls. These gaps represent areas where additional controls, policies, or documentation must be created to achieve compliance with both frameworks.

Which control domains have the most gaps between AS9100D — Aerospace Quality Management System and UK FCA/PRA Operational Resilience Framework?

The domain with the highest gap count is Operation (Clause 8) (11 gaps). Export the full domain-by-domain gap breakdown via the Professional tier to generate a prioritised remediation roadmap.

This platform provides educational compliance tools, not legal, regulatory, or professional compliance advice. Cross-framework mappings are AI-assisted interpretations and do not reproduce or replace official standards. Framework names and trademarks belong to their respective owners. Consult qualified professionals for your specific compliance requirements. See our Terms of Service.