Victoria Occupational Health and Safety Regulations 2017
Part 4.4: Asbestos – Victoria Occupational Health and Safety Regulations 2017

Victoria Occupational Health and Safety Regulations 2017 r292: r 292 Commissioning person must arrange air monitoring for Class A work

Whoever commissions Class A removal work must have asbestos paraoccupational air monitoring done before the work starts and throughout it, if the work is indoors, or if it is outdoors and will pose a risk to other people. Every sample must go for analysis as soon as reasonably possible once collected. At domestic premises the licence holder carries this duty (r 291). Monitoring is not required when glove bags are used (r 289). Act compliance: ss 22(1) and 26.

Maintained by Gerard Blokdyk

Other controls in Part 4.4: Asbestos – Victoria Occupational Health and Safety Regulations 2017

Query this from an agent

The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.