Whoever manages or controls a workplace covered by r 247(1) must give the Authority written notice of its contact details and the location of the emergency straight after it learns of the emergency and before demolition begins. Penalty: 60 penalty units (natural person) or 300 penalty units (body corporate).
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.