The same person must, as soon as possible, post a copy of the non-disturbance, improvement or prohibition notice in a conspicuous spot close to the part of the workplace where the affected work is going on. Maximum penalty: 5 penalty units for an individual, 25 for a body corporate.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.