Queensland Building and Construction Commission Act 1991 sch1b-35-38: Sch 1B ss 35 to 38 Honour the cooling-off withdrawal and refund the balance

The owner may withdraw from a regulated contract within 5 business days after receiving the signed copy (for level 2, also within 5 business days after receiving the consumer building guide if it came later), or at any time after 5 business days if neither has been received, by signed written notice given, left at or served on the contractor's address. Withdrawal is not available where a substantially identical previous contract existed or the owner obtained paid independent legal advice (s 36). On withdrawal the contractor may keep the retainable amount (reasonable out-of-pocket expenses plus $100 for a s 35(1) withdrawal), must refund the balance of any prepaid amount, and the owner is otherwise not liable. For a repair contract the owner may waive the right by written notice (s 39).

Maintained by Gerard Blokdyk

What else in your programme already covers this

This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

  • s7BA ss 7BA and 7BB Honour the 5-day cooling-off right and the rescission right where the warning was omitted

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.

Other controls in Schedule 1B: Domestic building contracts – Queensland Building and Construction Commission Act 1991

Query this from an agent

The graph holds this control, the 1 it maps to, and the evidence behind each claim, over MCP and REST.