At the service entrance equipment a sign tells responders what kinds of standby source are on site and where they are (individual unit equipment excepted), and where taking out a grounding or bonding link in the normal supply equipment would cut the alternate source off from the grounding electrode, a warning sign is fitted at the normal source equipment.
This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.
Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.
The graph holds this control, the 1 it maps to, and the evidence behind each claim, over MCP and REST.