Location choice considers geography, building type, occupancy and hazards; equipment is installed as the maker recommends and, where applicable, to NFPA 855; with normal power present the system may carry extra loads beyond Level 1 and Level 2, provided they drop automatically on power failure so capacity remains for the loads of both Levels.