Battery cells or units, transfer switches or other components that fail during acceptance are replaced, noted in the test record and the system retested. Factory test results for the finished system, battery specifications and the vendor's certificate of compliance are made available to the AHJ at the test.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.