Transfer switches, electrical, electronic or hybrid, separate or integral to the ECE, are rated to move all connected loads from the energy converter to the building supply and back, sized for those loads and every load class, isolate the load from the alternate sources, withstand the available fault current, fail so the load ends up on the building service, and can have their operation checked. Each is listed for emergency service as a factory assembled and tested unit, unless it is an integral part of listed ECE.
This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.
Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.
The graph holds this control, the 1 it maps to, and the evidence behind each claim, over MCP and REST.