4.6.3: after the public access cap, medical office facilities (consulting and reception rooms, breakout and meeting rooms, medical administration and stores served by base building services) and educational office facilities (classrooms, seminar rooms, student computer labs, administration, stores) may be included in base building ratings only where the base building direct HVAC to them is not sub-metered, capped at 25 % of the net office NLA (net office NLA divided by 0.75 less net office NLA) with their base building energy included in full; if that HVAC is sub-metered the spaces are excluded. A facility containing a hospital, operating theatre, specialist imaging, laboratory, day-stay treatment, ward, emergency facility, pharmacy or dental surgery is wholly excluded. These facilities are never included in whole building or tenancy ratings, and in co-assess applications are included for the base building component only.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.