Before notifying or bringing into use an assignment in any of the cases of Nos. 9.7 to 9.21 (GSO networks with other GSO networks; specific GSO earth stations and non-GSO FSS systems; BSS space stations in bands shared with terrestrial services; footnote-triggered coordination between non-GSO and GSO systems and with terrestrial services; earth stations whose coordination area reaches another country; terrestrial stations within an earth station's coordination area; agreement required by a footnote under No. 9.21), the administration must effect coordination with the administrations identified under Appendix 5 (9.6, 9.27). Requests go to the Bureau with Appendix 4 data for Nos. 9.7 to 9.14 and 9.21 (9.30), or directly to the identified administrations for earth-station cases under Nos. 9.15 to 9.19, with coordination-area diagrams (9.29, 9.31); adding bands or moving a GSO orbital position gets a new date of receipt (9.30); an administration left out or wrongly included says so within four months (9.41).
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.