Control production and service provision per ISO 9001 Section 8.5 supplemented by AQAP 2110 production controls including: special process qualification (welding + heat treatment + plating + non-destructive testing per AWS + ASME + NADCAP), identification and traceability throughout production, control of monitoring and measuring equipment per ISO 10012 (calibration + traceability to national standards), inspection and testing per quality plan, control of nonconforming outputs with material review board (MRB) disposition, and records control per ISO 9001 Section 7.5 with NATO-specified minimum retention of 10 years from contract completion.
This control maps to 28 controls across 16 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.
Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.
The graph holds this control, the 28 it maps to, and the evidence behind each claim, over MCP and REST.