NATO AQAP 2110 - Quality Assurance Requirements for Design, Development, and Production
Production and Inspection

NATO AQAP 2110 - Quality Assurance Requirements for Design, Development, and Production AQAP2110-7: Production, Special Processes, Inspection, Testing, and Records

Control production and service provision per ISO 9001 Section 8.5 supplemented by AQAP 2110 production controls including: special process qualification (welding + heat treatment + plating + non-destructive testing per AWS + ASME + NADCAP), identification and traceability throughout production, control of monitoring and measuring equipment per ISO 10012 (calibration + traceability to national standards), inspection and testing per quality plan, control of nonconforming outputs with material review board (MRB) disposition, and records control per ISO 9001 Section 7.5 with NATO-specified minimum retention of 10 years from contract completion.

What else in your programme already covers this

This control maps to 28 controls across 16 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

  • 1.1 SWIFT Environment Protection
  • 3.1 Physical Security
  • QMSR-820.10 Requirements for a Quality Management System - ISO 13485:2016 Sections 4-8 incorporation (§820.10)
  • QMSR-ISO13485-Sec8 Measurement, analysis and improvement (ISO 13485:2016 Section 8)

SWIFT CSCF · 2 controls

  • SWIFTCSCF-1 Restrict Internet Access and Protect Critical Systems (Objective 1)
  • SWIFTCSCF-3 Physically Secure the Environment (Objective 3)

ISO/IEC 27014:2020 · 1 control

  • 2.5.2 Verification Activities

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.

Query this from an agent

The graph holds this control, the 28 it maps to, and the evidence behind each claim, over MCP and REST.