A PCBU ensures fire protection and firefighting equipment is designed and built for the types and quantities of hazardous chemicals and their conditions of use, having regard to their fire load, other fire loads and compatibility, is compatible with the primary emergency service organisation's equipment, is properly installed, tested and maintained with a dated record of the latest test and maintenance kept until the next; if any part becomes unserviceable, the implications are assessed, alternative measures manage the affected risks, and it is returned to full operation as soon as practicable.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.