The person with management or control of pressure equipment ensures it is inspected regularly by a competent person and that inspected gas cylinders carry a current inspection mark with the latest inspection date; at a gas cylinder filling station, cylinders are filled only if they bear a current inspection mark and only with the gas they are designed for.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.