Australia Model Code of Practice: Construction Work
Section 7 and Appendices J and K: General workplace management arrangements – Australia Model Code of Practice: Construction Work
Australia Model Code of Practice: Construction Work 7b: 7 Principal contractor manages materials, stored plant, traffic and essential services risks (r 315)
What does 7b require?
The principal contractor must manage the risks associated with the storage, movement and disposal of construction materials and waste at the workplace, the storage of plant not in use, traffic in the vicinity of the workplace that may be affected by the construction work, and essential services at the workplace (r 315). Before work starts it must find out what essential services (gas, water, sewerage, telecommunications, electricity, chemicals, fuel and refrigerant in pipes or lines) are at or near the work location and could create a risk if contacted or damaged, including those hidden in slabs and walls; work near pressurised gas mains, chemical, fuel or refrigerant lines or energised electrical installations is high risk construction work needing a SWMS.
This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.