The SWMS must be kept and be readily accessible to anyone engaged in the high risk construction work and available for inspection until the work is completed, or where a notifiable incident occurs in connection with it, for at least 2 years after the incident (r 303). If not kept at the workplace it should be stored where it can be brought quickly; it can be electronic; and every revised version should be kept.
This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.
Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.
The graph holds this control, the 1 it maps to, and the evidence behind each claim, over MCP and REST.