PCBUs must ensure the SWMS is readily accessible to workers engaged in the high risk construction work, and workers should understand the hazards and risks, understand and implement the controls, and know what to do if work departs from the SWMS; this may be covered in induction, workplace-specific training or toolbox talks by the principal contractor, contractor or subcontractor.
This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.
Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.
The graph holds this control, the 1 it maps to, and the evidence behind each claim, over MCP and REST.