Australia Model Code of Practice: Construction Work 4.1: 4.1 Prepare a SWMS before high risk construction work starts, and coordinate who prepares it (r 299)

A PCBU must prepare a safe work method statement, or ensure one has been prepared, before high risk construction work starts (WHS Regulations r 299). A SWMS is a written document identifying the high risk construction work, its hazards and risks, the controls and how they will be implemented, monitored and reviewed. The person carrying out the work is best placed to prepare it with the workers who will do it; where several PCBUs share the duty they must consult and cooperate to coordinate who prepares it. One SWMS can cover several high risk activities at a workplace, or separate SWMS may be prepared, in which case their interaction and consistency should be considered (for example a roof plumber and a crane operator each needing a SWMS for falls over 2 metres and powered mobile plant). Other construction work needs no SWMS but its risks must still be managed.

Maintained by Gerard Blokdyk

What else in your programme already covers this

This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

ISO 45001:2018 · 1 control

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.

Other controls in Section 4: Safe work method statements – Australia Model Code of Practice: Construction Work

Query this from an agent

The graph holds this control, the 1 it maps to, and the evidence behind each claim, over MCP and REST.