Australia Model Code of Practice: Construction Work
Section 4: Safe work method statements – Australia Model Code of Practice: Construction Work

Australia Model Code of Practice: Construction Work 4.2b: 4.2 Consult workers and HSRs when preparing and reviewing a SWMS

Workers and their HSRs, if any, must be consulted when a SWMS is prepared and when it is reviewed; if no workers are engaged at planning, consultation occurs when the SWMS is first made available to them, for example during workplace-specific training or a toolbox talk. The SWMS may record the workers consulted, the date and their signatures.

Maintained by Gerard Blokdyk

What else in your programme already covers this

This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

ISO 45001:2018 · 1 control

  • 5.4 Consultation and participation of workers

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.

Other controls in Section 4: Safe work method statements – Australia Model Code of Practice: Construction Work

Query this from an agent

The graph holds this control, the 1 it maps to, and the evidence behind each claim, over MCP and REST.