On request, a plant designer must supply the s 27(1)(c) information (design purpose, test results and conditions for safe use) to any current or intended user of the plant. Maximum penalty: 1800 penalty units (individual) or 9000 penalty units (body corporate).
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.