UK Construction (Design and Management) Regulations 2015 (CDM 2015)
Part 3 Principal designer and principal contractor duties – UK Construction (Design and Management) Regulations 2015 (CDM 2015)

UK Construction (Design and Management) Regulations 2015 (CDM 2015) 13.4: Induction, site security and welfare

What does 13.4 require?

The principal contractor ensures a suitable site induction, takes steps to prevent unauthorised access and provides Schedule 2 welfare facilities throughout the construction phase.

Maintained by Gerard BlokdykVerified against the published standard Control text last updated