UK Construction (Design and Management) Regulations 2015 (CDM 2015)
Part 3 Principal designer and principal contractor duties – UK Construction (Design and Management) Regulations 2015 (CDM 2015)

UK Construction (Design and Management) Regulations 2015 (CDM 2015) 12.5-10: Health and safety file

What does 12.5-10 require?

The principal designer prepares during the pre-construction phase a health and safety file suited to the project with information likely to be needed for later work, keeps it updated, receives the principal contractor's information for it, passes it to the principal contractor if its appointment ends early (who then keeps it updated), and at project end the principal designer (or principal contractor) hands it to the client.

Maintained by Gerard BlokdykVerified against the published standard Control text last updated

What else in your programme already covers this

This control maps to 2 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

  • 6:4.5.4 4.5.4 Using information
  • 6:5.2 5.2 Asset information requirements for health and safety

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.

Other controls in Part 3 Principal designer and principal contractor duties – UK Construction (Design and Management) Regulations 2015 (CDM 2015)

Query this from an agent

The graph holds this control, the 2 it maps to, and the evidence behind each claim, over MCP and REST.