UK Construction (Design and Management) Regulations 2015 (CDM 2015) 11.6: Pre-construction information

What does 11.6 require?

The principal designer assists the client in providing pre-construction information and, within its control, provides it promptly and conveniently to every designer and contractor appointed or being considered.

Maintained by Gerard BlokdykVerified against the published standard Control text last updated

Other controls in Part 3 Principal designer and principal contractor duties – UK Construction (Design and Management) Regulations 2015 (CDM 2015)

Query this from an agent