UK Construction (Design and Management) Regulations 2015 (CDM 2015) 12.1-4: Construction phase plan

What does 12.1-4 require?

Before setting up the site, the principal contractor draws up (or arranges) a construction phase plan setting out health and safety arrangements and site rules, with specific measures for any Schedule 3 high-risk work (burial or falls, harmful substances, ionising radiation, high voltage lines, drowning, wells and tunnels, diving, compressed air, explosives, heavy prefabricated components), assisted by the principal designer's information, and keeps it reviewed and updated throughout the project.

Maintained by Gerard BlokdykVerified against the published standard Control text last updated

Other controls in Part 3 Principal designer and principal contractor duties – UK Construction (Design and Management) Regulations 2015 (CDM 2015)

Query this from an agent

The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.