The principal designer plans, manages and monitors the pre-construction phase and coordinates health and safety so that, so far as reasonably practicable, the project is carried out without risk, applying the general principles of prevention (and any construction phase plan or health and safety file) when planning work stages and their timing, and identifying and eliminating or controlling foreseeable risks to those building, maintaining, cleaning or using the structure.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.