UK Construction (Design and Management) Regulations 2015 (CDM 2015) 11.4-5: Ensuring designers comply and cooperate

What does 11.4-5 require?

The principal designer ensures all designers comply with regulation 9 and that everyone working on the pre-construction phase cooperates with the client, the principal designer and each other.