NRC 10 CFR 73.54 - Nuclear Facility Cybersecurity
Regulatory Guide 5.71 Appendix C Security Controls

NRC 10 CFR 73.54 - Nuclear Facility Cybersecurity RG5.71-C.4: Incident Response Plan

Licensees must develop and maintain a cyber security incident response plan with defined procedures.

Maintained by Gerard BlokdykVerified against the published standard Control text last updated

What else in your programme already covers this

This control maps to 152 controls across 61 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

API 1164 · 3 controls

  • API1164-17 Wireless and Field Communications
  • API1164-18 Field Device Security
  • API1164-19 Safety Instrumented Systems Interface

BSI IT-Grundschutz · 3 controls

  • BSI-18 Incident response planning and testing
  • BSI-20 Incident reporting and notification
  • BSI-21 Forensic analysis capabilities
  • IS.AR.215 Information Security Incident Response
  • IS.D.OR.225 External Reporting of Information Security Events
  • IS.I.OR.225 External Reporting
  • FFIEC-23 Regulatory reporting requirements
  • FFIEC-24 Customer notification procedures
  • FFIEC-25 Post-incident review and improvement

IEC 62443 · 3 controls

  • IEC62443-16 Incident response plan for operational disruptions
  • IEC62443-17 Recovery plan for critical systems
  • IEC62443-20 Exercises and drills for OT incidents

ISO 22320:2018 · 3 controls

  • ISO-22320-5.2 Incident management process
  • ISO-22320-B Annex B: Incident management plan structure
  • ISO-22320-C Annex C: Incident management task examples

ISO/IEC 27019:2024 · 3 controls

  • ISO27019-16 Incident response plan for operational disruptions
  • ISO27019-18 Reporting obligations to authorities
  • ISO27019-20 Exercises and drills for OT incidents
  • NIST-CSF-ID.IM-04 Incident response plans and other cybersecurity plans that affect operations are established, communicated, maintained, and improved
  • NIST-CSF-RC.RP-01 The recovery portion of the incident response plan is executed once initiated from the incident response process
  • NIST-CSF-RS.MA-01 The incident response plan is executed in coordination with relevant third parties once an incident is declared

NIST SP 1800-32 · 3 controls

NIST SP 800-53 Rev 5 · 3 controls

  • NIST800-IR-2 IR-2 Incident Response Training
  • NIST800-IR-5 IR-5 Incident Monitoring
  • NIST800-IR-7 IR-7 Incident Response Assistance

PCI P2PE · 3 controls

  • PCI-P2PE-21 Incident detection and classification
  • PCI-P2PE-22 Incident response and containment
  • PCI-P2PE-25 Post-incident review and improvement

PCI PIN Security · 3 controls

  • PCI-PIN-23 Regulatory reporting requirements
  • PCI-PIN-24 Customer notification procedures
  • PCI-PIN-25 Post-incident review and improvement

PCI SSF · 3 controls

  • PCI-SSF-21 Incident detection and classification
  • PCI-SSF-24 Customer notification procedures
  • PCI-SSF-25 Post-incident review and improvement
  • PICERL-C2 System Backup
  • PICERL-C3 Long-Term Containment
  • PICERL-L3 Plan Improvement
  • SOCI-CIRMP-PHYSICAL CIRMP hazard vector: Physical security and natural hazards
  • SOCI-S30CB Statutory incident response planning
  • SOCI-S35AB Ministerial authorisation for government assistance

APPI · 2 controls

  • APPI-A41 Preparation and Handling of Pseudonymized Personal Information
  • APPI-A43 Preparation of Anonymized Personal Information

APRA CPS 234 · 2 controls

  • CPS234-21 Implementation of Information Security Controls
  • CPS234-25 Internal Audit Review of Information Security Controls
  • ASD37-31 Hunt to discover incidents (Very Good)
  • ASD37-33 Capture network traffic (Limited)

Bahrain PDPL · 2 controls

  • UAE-PDPL-Art.10 Data Protection Officer (DPO) (UAE PDPL Article 10)
  • UAE-PDPL-Art.18_19_20_21 Security measures, controller/processor relationship, DPIA (UAE PDPL Articles 18-21)

ISO/IEC 30111:2019 · 2 controls

  • 30111-3 Terms and definitions
  • 30111-5.2 Vulnerability handling team

SOC 2 · 2 controls

  • SOC2-CC7.4 CC7.4 Responding to security incidents
  • SOC2-CC7.5 CC7.5 Recovering from security incidents
  • SSAE18-CC7.4 CC7.4 - Incident Response
  • SSAE18-CC7.5 CC7.5 - Incident Recovery

Saudi Arabia PDPL · 2 controls

  • SA-PDPL-16 Data breach notification requirements
  • SA-PDPL-17 Security incident response procedures
  • D.1 Incident Response Planning
  • D.2 Incident Reporting
  • PMF-M.4 Privacy Incident Management
  • CPS230-13 Board Accountability for Operational Risk Management
  • 4.4.7 Emergency and Incident Response
  • BB-DPA-20 Sections 50-60 - Registration and Responsibilities
  • CA-12 Deploys Through Policies and Procedures
  • CA-ITSG33-SC-01 Security Control Catalogue
  • CAT-D5-1 Incident planning and strategy
  • FTC-Safeguards-IR-Plan-BoardReporting-FTC-Notification Written Incident Response Plan + Board Reporting + FTC Breach Notification (16 CFR 314.4(h), (i), (j))
  • ISO28001-PC-04 Supply Chain Continuity Planning
  • ISO20000-11 Incident management

ISO/IEC 27010:2015 · 1 control

  • 27010-16.1 Continuity of Sharing

ISO/IEC 27400:2022 · 1 control

  • 27400-6.5 Security monitoring and incident response

ITIL 4 · 1 control

  • ITIL4-11 Incident management
  • NFPA1600-6.3 Emergency Response Operations

NIST SP 800-190 · 1 control

  • NGCB-6 Incident Response, 72-Hour NGCB Notification, and Independent Investigation

South Korea ISMS-P · 1 control

  • ISMSP-SYS-05 Incident Response
  • TSAPIPE-2 OT/IT Network Segmentation and Access Control

Taiwan PDPA · 1 control

  • TAIWAN-3 Data Subject Rights
  • TANZANIA-4 Security and Cross-Border
  • TSSR-NOT-2 Security Incident Notification
  • TEXASTDPSA-2 Consumer Rights
  • TRINIDAD-3 Data Subject Rights
  • UKGDPRREG-3 Controller and Processor (Articles 24-43)
  • UKGAMBLE-4 Resilience and Incident Response
  • OB-OPS.4 Incident Management
  • UK-TSA-MON-02 Incident Notification

Uruguay DPL · 1 control

  • URUGUAY-4 Security and Cross-Border

Virginia CDPA · 1 control

  • VIRGINIAVCDPA-3 Sensitive Data Consent and Children

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.

Other controls in Regulatory Guide 5.71 Appendix C Security Controls

Query this from an agent

The graph holds this control, the 152 it maps to, and the evidence behind each claim, over MCP and REST.