FSS, MSS and BSS networks subject to coordination under Nos. 9.7, 9.11, 9.12, 9.12A and 9.13, and certain Appendix 30, 30A and 30B submissions, must send the Bureau within 30 days after the seven-year bringing-into-use limit the due diligence information of Annex 2: the network's identity (name, administration, operator, satellite, bands, orbital characteristics), the spacecraft manufacturer (name, contract date, delivery window, number procured) and the launch services provider (name, contract date, launch or in-orbit delivery window, launch vehicle, launch facility), signed by an authorized official (Annex 1, §§ 1 to 7); incomplete information not completed in time leads to cancellation of the network and deletion of its provisional recording (§§ 9 to 11).
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.