ISO 27001:2022 8.6: Capacity management

Resource use is to be monitored and adjusted to fit present and expected capacity needs. Purpose (stated in ISO/IEC 27002:2022): keeps enough capacity available in systems, staff, offices and other facilities. As an Annex A reference control, it is compared with the controls determined in risk treatment (6.1.3 c) and recorded in the Statement of Applicability as included or excluded, with the justification and implementation status (6.1.3 d); implementation guidance is ISO/IEC 27002:2022 8.6.

Maintained by Gerard BlokdykVerified against the published standard Control text last updated

What else in your programme already covers this

This control maps to 34 controls across 21 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

NIST SP 800-53 Rev 5 · 6 controls

C5 (Germany) · 3 controls

  • C5-OPS-01 Capacity Management - Planning
  • C5-OPS-02 Capacity Management - Monitoring
  • C5-OPS-03 Capacity Management - Controlling of Resources

COBIT 2019 · 3 controls

  • BAI04.01 BAI04.01 Assess current availability, performance and capacity and create a baseline
  • BAI04.03 BAI04.03 Plan for new or changed service requirements
  • BAI04.05 BAI04.05 Investigate and address availability, performance and capacity issues

ISO 22301:2019 · 3 controls

  • 7.1 Resources
  • 8.3.4 Resource requirements
  • 9.1 Monitoring, measurement, analysis and evaluation

FedRAMP High · 2 controls

  • AU-4 Audit Log Storage Capacity
  • SC-5 Denial-of-Service Protection

FedRAMP Moderate · 2 controls

  • AU-4 Audit Log Storage Capacity
  • SC-5 Denial-of-Service Protection
  • ANSSI-HYG-35 Anticipate the End of Maintenance of Software and Systems
  • CPS230-P25 Information and Technology Capability and Asset Health
  • NS-5 Deploy DDOS protection
  • CFTC-SS-12 Capacity and Performance Planning Category

CIS Controls v8 · 1 control

  • CIS-8.3 Ensure Adequate Audit Log Storage

DORA · 1 control

ISO 27001:2013 · 1 control

ISO 27002:2022 · 1 control

  • 8.6 Capacity management

ISO 27701:2019 · 1 control

  • 6.9.1 Operational procedures and responsibilities

ISO/IEC 42001:2023 · 1 control

  • A.4 Resources for AI systems

PCI DSS 4.0 · 1 control

  • 12.1.3 12.1.3 Security roles defined and acknowledged by all personnel

SOC 2 · 1 control

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.

Other controls in Technological controls – ISO 27001:2022

You are reading one control. How much of ISO 27001:2022 have you already done?

ISO 27001:2022 8.6 is one control. If you already hold one of the frameworks below, a reviewed crosswalk already says how much of ISO 27001:2022 your existing evidence covers. Hold NIST SP 800-53 Rev 5 and 79 of 93 ISO 27001:2022 controls already carry evidence.

Each report names every control your existing framework evidences, every one it does not, the reasoning behind each claim, and the claims that were argued against and rejected. 170 were rejected on the NIST SP 800-53 Rev 5 pair alone.

Query this from an agent

The graph holds this control, the 34 it maps to, and the evidence behind each claim, over MCP and REST.