ISO 19650 - Organisation and Digitisation of Information about Buildings and Civil Engineering Works (BIM)
ISO 19650-2:2018 delivery phase of the assets – ISO 19650 - Organisation and Digitisation of Information about Buildings and Civil Engineering Works (BIM)

ISO 19650 - Organisation and Digitisation of Information about Buildings and Civil Engineering Works (BIM) 2:5.4.4: 5.4.4 Establish the task information delivery plans

What does 2:5.4.4 require?

Every task team shall draw up a TIDP and keep it up to date for the whole appointment. It considers the milestones, what the detailed matrix makes the team responsible for, the requirements of the lead appointed party, the shared resources available, and the time needed to produce, coordinate, review and approve information. For each container the TIDP shall give the container's name and title, any dependencies or predecessors, the level of information need, how long production is expected to take, the responsible author and the delivery milestones.

Maintained by Gerard BlokdykControl text last updated

What else in your programme already covers this

This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

ISO 9001:2015 · 1 control

  • 8.3.2 Design and development planning

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.