Any methods and procedures peculiar to the appointing party's organization shall be set by it and placed inside the corresponding project-level methods and procedures. It considers how information about existing assets is captured; how new information is produced, reviewed or approved; how information is secured or distributed; and how it is handed over to the appointing party.
This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.
Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.
The graph holds this control, the 1 it maps to, and the evidence behind each claim, over MCP and REST.