ISO 19650 - Organisation and Digitisation of Information about Buildings and Civil Engineering Works (BIM) 2:5.3.6: 5.3.6 Establish the delivery team's risk register

What does 2:5.3.6 require?

A risk register shall be set up by the prospective lead appointed party, recording risks to delivering information on time against the EIR and how the team will manage them. It considers assumptions made about the EIR, achieving the milestones, the information protocol, carrying out the delivery strategy, adopting the standard and procedures, whether proposed amendments are accepted, and mobilizing the capability and capacity needed.

Maintained by Gerard BlokdykControl text last updated

What else in your programme already covers this

This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

ISO 9001:2015 · 1 control

  • 6.1 Actions to address risks and opportunities

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.

Other controls in ISO 19650-2:2018 delivery phase of the assets – ISO 19650 - Organisation and Digitisation of Information about Buildings and Civil Engineering Works (BIM)

Query this from an agent

The graph holds this control, the 1 it maps to, and the evidence behind each claim, over MCP and REST.