The appointing party shall set out its EIR for the prospective lead appointed party, covering: which information requirements are to be met (taken from its OIR, AIR and PIR); the level of information need attached to every requirement; acceptance criteria for every requirement (reflecting the information standard, the procedures and methods for production, and the reference information and shared resources); supporting material the lead appointed party may need (existing asset information, shared resources, guidance, standards, exemplars); and the date by which every requirement must be satisfied, measured against milestones and decision points and leaving time for review and internal assurance.
This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.
Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.
The graph holds this control, the 1 it maps to, and the evidence behind each claim, over MCP and REST.